• Contact
  • Magazines Archive
  • Subscribe Now
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
No Result
View All Result
Home News

Al Salem Johnson Controls YORK HVAC System Ensures 100% Fresh Air Inside Makkah’s Grand Mosque

cbnme by cbnme
May 14, 2020
in News, Suppliers

The Kingdom of Saudi Arabia has implemented several precautionary measures at Al-Masjid Al Haram in Makkah in the wake of COVID-19, with a temporary hold on prayers and Umrah inside the Mosque until further notice, to ensure the safety of worshipers.

The General Presidency for the Affairs of the Grand Mosque and the Prophet’s Mosque is continuously implementing sterilizations and other precautionary measures, in preparation for the reopening of the Two Holy Mosques once the pandemic situation subsides. The Presidency initially closed Al-Masjid Al-Haram for 48-hours in order to sterilize the entire premises.

Al Salem Johnson Controls (YORK), a leading multi-industrial company and a pioneering provider of integrated solutions, that incorporate HVAC equipment, fire and security systems, building management systems and controls, for residential, commercial and industrial sectors, in Saudi Arabia, Lebanon, Egypt and Yemen, explained that the Company’s HVAC system played a significant role in this 48-hour sterilization process and afterwards. All YORK Chillers at Al Shamiyah and Ajyad Cooling Plants and the Air Handling Units (AHUs) inside the Mosque were shut down for 48 hours, in order to raise the temperature inside the Mosque to around 30-32 degrees Celsius, the level required for the sterilization. Simultaneously, the AHUs were inspected, and the filters, ducts, drain pans and cooling coils were cleaned and sterilized, to assure that clean high quality air is supplied and maintained throughout the Mosque.

Each YORK Chiller takes about three to four minutes to be completely turned off. While the pipes connecting the Chiller Plants to the Mosque, keep supplying the AHUs with chilled water for about 30 minutes, before the water becomes warm and the AHUs are turned off.

After the sterilization was completed, and due to the reduced load inside the Grand Mosque these days, only 10% of the total cooling capacity was turned back on – sufficient to maintain a comfort zone for the few people inside the Mosque. It also helps achieve the right moisture level that will maintain the structural integrity of the Mosque. The remaining 90% of the Chillers and AHUs are subject to preventive maintenance and long-term storage procedures, to ensure the operation efficiency once the cooling plants are returned to full cooling capacity, when the pandemic subsides.

Al Salem Johnson Controls (YORK) highlighted that the long-term storage service is a form of preventive maintenance applied on chillers that are in a non-operating mode over a long period of time. This maintenance is completed through frequent checkups, the monitoring of refrigerant and water pressure inside the chillers, to preserve the outer body of the chiller from moisture attacks and corrosion. Moreover, motor rotations and oiling are monitored, as well as the alignment of the chiller’s motor and compressor.

When the HVAC system is turned back to full force, each chiller takes about six to seven minutes to reach full operational efficiency and cooling capacity, thus gradually achieving the total cooling capacity. It is worth mentioning that long before the COVID-19 outbreak, Al Salem Johnson Controls (YORK) equipped the Two Holy Mosques with specialized and tailor-made HVAC systems, which take into consideration the crowded nature of both locations, particularly in peak seasons such as Hajj and Umrah, as well as during prayer times.

The YORK Air Handling Units supply 100% fresh air, by containing contaminated air and exhausting it to the outdoors, and then replacing it with well-treated fresh air, which re-enters the space after a rigorous filtration process. YORK Air Handling Units are equipped with filters that do not allow the passage of big particles to the air-conditioned environment, through multiple stages of filtration that can achieve up to 95% filtration efficiency.

The total cooling capacity of the HVAC System at the Great Mosque in normal days is 159,000 TR (equivalent to the cooling of 15,000 medium-sized apartments). This is provided through an integrated HVAC system, which consists of two Chiller Plants located in Al Shamiyah and Ajyad, connected to the AHUs inside the Mosque.

The Plants provide the chilled water that flows inside the Air Handling Units, which in turn pump the cooled 100% fresh air across the Mosque. The Chiller Plant at Al Shamiyah is considered to be the second largest Chiller Plant in the World, housing specially designed YORK OM Chillers, which are huge sophisticated chillers, with motors similar in size to a regular car.

The HVAC equipment has been especially engineered to meet the requirements of the Holy Mosque, particularly in peak seasons, and to adapt to the ventilation and cooling needs of the ongoing expansion works at Al-Haram.

Photo: Dr. Mohanad AlShaikh, CEO of Al Salem Johnson Controls

Dr. Mohanad AlShaikh, CEO of Al Salem Johnson Controls, expressed appreciation for the great efforts made by the Kingdom in the development of the Two Holy Mosques, and making them a strategic priority for the Government of the Custodian of the Two Holy Mosques King Salman. He also lauded the precautionary measures taken by the Government amid COVID-19, to ensure the safety of the guests of Allah, as well as that of the citizens and residents of the Kingdom.

Al Salem Johnson Controls (YORK) has allocated 135 service technicians for the Grand Mosque’s HVAC system, who are working around-the-clock at the Cooling Plants in Ajyad and Al Shamiyah, to ensure smooth operation of the HVAC system, and provide any required repair or maintenance services in record time.

Share30Tweet19Share5Pin7Send
cbnme

cbnme

Recommended For You

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

January 22, 2026
World Economic Forum: Shamma bint Mohammed Spotlights Emirati Women’s Shift from Empowerment to Global Leadership

World Economic Forum: Shamma bint Mohammed Spotlights Emirati Women’s Shift from Empowerment to Global Leadership

January 21, 2026
QIA, Goldman Sachs Sign MoU to Deepen Strategic Partnership, Targeting $25 Billion in Investments

QIA, Goldman Sachs Sign MoU to Deepen Strategic Partnership, Targeting $25 Billion in Investments

January 21, 2026
Gold and Silver Keep Reaching New Record Highs

Gold and Silver Keep Reaching New Record Highs

January 21, 2026
Automobili Lamborghini sets new record for deliveries in 2025 despite headwinds

Automobili Lamborghini sets new record for deliveries in 2025 despite headwinds

January 21, 2026
Over 250 global visionaries will surface unseen breakthroughs across the food chain from origin to market

Gulfood Launches Dedicated Platform to Support High-Growth Food-Tech Startups

January 21, 2026
Next Post

Heart-to-Heart: Accor's people-first approach to battling a global pandemic

Latest News

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

January 22, 2026
The Sky Mansion is a masterpiece of design

ELEVATE Sets New Benchmark with AED 38 Million Sky Mansion Sale

January 21, 2026
Breez presents a rare ownership opportunity in one of the city’s most prestigious waterfront locations

Breez by Danube Leads Dubai’s Next Wave of Waterfront Living

January 21, 2026
Dubai Holding strengthens its presence in Europe’s hospitality sector by acquiring a property in Mallorca

Dubai Holding strengthens its presence in Europe’s hospitality sector by acquiring a property in Mallorca

January 21, 2026
BusinessToday_logo

Get In Touch

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Business Today Middle East – December 2025
BusinessToday Magazines

Business Today Middle East – December 2025

by Aya Zhang
January 13, 2026
BusinessToday-nov-2025
BusinessToday Magazines

Business Today Middle East – November 2025

by Staff Writer
January 13, 2026
Sister Publications
  • Construction Business News
  • Design Middle East
  • Logistics News ME
  • Hotel & Catering
  • Entrepreneur Al Arabiyah
  • Entrepreneur Middle East
Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW

Get In Touch

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Sister Publications
  • Construction Business News
  • Design Middle East
  • Logistics News ME
  • Hotel & Catering
  • Entrepreneur Al Arabiyah
  • Entrepreneur Middle East
Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW
Business Today Middle East – December 2025
BusinessToday Magazines

Business Today Middle East – December 2025

by Aya Zhang
January 13, 2026
BusinessToday-nov-2025
BusinessToday Magazines

Business Today Middle East – November 2025

by Staff Writer
January 13, 2026

Copyright © 2026 BNC Publishing. All Rights Reserved.

No Result
View All Result
  • Home
  • Landing Page
  • Buy JNews
  • Support Forum
  • Contact Us

© 2026 BusinessToday . All Rights Reserved.

Go to mobile version