• Contact
  • Magazines Archive
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
No Result
View All Result
Home Construction

Robust Strategy: Sam Alcock, Dubai Director of Tenable Fire Engineering Consultancy

cbnme by cbnme
November 13, 2020
in Construction, Expert Insight, News, Projects
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Sam Alcock, Dubai Director of Tenable Fire Engineering Consultancy, discusses how fire and life safety should remain a priority during every phase of a building’s life cycle

Over the past decade, we have seen significant regional developments in fire and life safety, with countries increasingly benchmarking against international standards and codes. The UAE Fire and Life Safety Code of Practice, in particular, is detailed and clearly defined with very little scope for interpretation to ensure the preservation of life and asset protection remain priorities. Similarly, the Saudi Arabia Building Code 2018 also recognises fire and life safety as a fundamental necessity throughout a project’s life cycle. Codes such as these guide developers during decisions that impact not only the project’s budget, but also the longevity and safety of a project now and in the future. While it could be considered an unnecessary expense to engage with a qualified fire engineer from the onset of a project, failure to do so can ultimately be more expensive down the line.

Having a robust fire and life safety code allows us to work with stakeholders to develop a comprehensive fire and life safety strategy, necessary for ensuring code compliance and helping stakeholders achieve desired safety standards. This fire and life safety strategy also acts as a guide for contractors during the construction phase to assure stakeholders that works are being carried out in line with the building’s design intent. Despite the criticality of a fire and life safety strategy to the longterm success of a project, stakeholders oftentimes overlook the need to engage with a fire consultant during the initial design stage of a project, potentially resulting in costly rectifications during construction. For example, not having a sufficient number of stairwells as specified in the code can have a huge impact on whether a project is awarded necessary approvals. If this is not identified during the design phase, adding an additional stairwell to a completed building is often not possible or practical, and finding an alternative solution can be costly and time-consuming.

To those developing a fire a life safety strategy, the UAE Code offers sector-specific guidance to ensure the code requirements, such as means of egress, smoke control and fire protection, align with the purpose of the building. For residential projects, as the residents are aware of their surroundings, the sleeping risks we identify will differ from that of a hotel, where guests are in a new environment and are unaware of their surroundings should they need to evacuate in the event of a fire. For low rise, residential buildings under a height of 15 metres, a single stairwell is sufficient as the means of egress. In contrast, hotels, regardless of the height of the building, require a minimum of two stairwells to ensure compliance. For education projects, such as schools and universities, there are no sleeping risks, but the occupants may be children, so the risks posed are higher, and the means of egress and travel distance in the event of a fire must be shorter than that of an office or a residential apartment building.

Sector-specific planning also applies to healthcare projects, such as clinics and hospitals, as patient capability and active surgeries must be taken into consideration, along with the standard sleeping risks, non-sleeping risks and lack of familiar surroundings. For commercial projects, such as shopping malls with a high daily visitor footfall, some occupants may be aware of their surroundings whereas others may not be, further increasing the risk in the event of a fire. In this instance, increased smoke control is required to permit extended travel distances.

A building’s fire and life safety strategy goes beyond the construction phase and continues into the operational phase. Therefore, it is important to ensure fire and life safety is included within the facilities management (FM) of the building’s upkeep. Stakeholders must ensure they appoint an FM provider that understands and respects the importance of fire and life safety and ensures the fire safety systems are tested thoroughly and in adherance to the code. For example, it is mandatory for stair pressurisation to be tested twice a year, fire alarms to be tested four times a year and for all ducts and dampeners to be kept clean and working sufficiently. However, the responsibility of fire and life safety does not stop with the FM provider. Chapter 18 of the UAE Fire and Life Safety Code of Practice defines stakeholder responsibilities, stating that FM responsibility also lies with building owners, tenants and residents.

Despite regional authorities outlining the need for an approved fire engineer to verify designs and final construction prior to final government approvals, this is one area of country codes that we see misinterpreted the most. As pressures to reduce costs and deliver projects in ever tighter timeframes increase, some succumb to the temptation of not engaging with a qualified, approved fire consulting professional until a problem arises. Oftentimes, the need for rectifications not only causes delays but also results in unforeseen costs, making consulting a fire engineer at the beginning of a project a more economical and safer course of action.

Share30Tweet19
cbnme

cbnme

Recommended For You

Through the programme, students explored key principles of sustainable material selection, carbon-conscious design, and effective waste management

Nakheel and Bildits Launch ‘Blueprint for the Future’

January 8, 2026
The campaign is launched under the slogan ‘Step by Step’ and focuses on delivering clear, simplified awareness content that addresses the most common inquiries about Ejari services

DLD Promotes Lease Registration Compliance with New Ejari Awareness Campaign

January 8, 2026
The third runway represents a milestone within the King Salman International Airport Master Plan

KSIA Advances Airfield Expansion with Third Runway Milestone

January 8, 2026
Bonds Avenue Residences is the inaugural development by Amirah Developments, setting a bold standard for upscale living on the iconic Dubai Islands

Amirah Developments Marks Major Progress at Bonds Avenue Residences

January 8, 2026
Next Post
JA The Resort announces line-up of festive offerings

JA The Resort announces line-up of festive offerings

Related News

HCT, Dubai Cares sign MoU on fundraising, community engagement initiatives

Ministry of Communication, Royal Mail Sign MoU

May 29, 2014
Board of Directors of UAE Central Bank holds meeting

Board of Directors of UAE Central Bank holds meeting

February 5, 2015
Silatech and Tamweelcom to Expand Support for Young Jordanian Entrepreneurs

Silatech and Tamweelcom to Expand Support for Young Jordanian Entrepreneurs

August 22, 2013
BusinessToday

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Quick Links

  • Contact
  • Magazines Archive

Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW

© 2026 BusinessToday . All Rights Reserved.

No Result
View All Result
  • Home
  • Landing Page
  • Buy JNews
  • Support Forum
  • Contact Us

© 2026 BusinessToday . All Rights Reserved.

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?