• Contact
  • Magazines Archive
  • Subscribe Now
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
No Result
View All Result
Home Construction

Marr’s Reaches Construction Milestone

cbnme by cbnme
November 13, 2020
in Construction, Machinery, News

Marr Contracting Pty Ltd, have reached a milestone on construction of Sydney’s newest landmark, Crown Sydney.

With the project officially topped out, it was time for Marr’s 390D crane, which has been working atop Crown Sydney for the past 27 months, to be removed. Marr’s team of highly skilled riggers have been working approximately 300-metres above Sydney Harbour to remove the crane’s 46-metre boom and other sections using Marr’s unique recovery crane system – marking the latest in a series of engineering feats on the project.

As Sydney’s first luxury resort in Barangaroo, Crown Sydney will include 349 hotel rooms and suites, luxury residential apartments, 14 signature restaurants and bars, premium retail outlets, pool and spa facilities and more.

From a construction point-of-view, its location on the Barangaroo foreshore, combined with its striking architectural design, posed a number of significant construction challenges to Crown in developing their construction methodology for the project. Knowing they needed to think differently about how to construct the project they contacted The Men From Marr’s to help them come up with a solution.

Due to its location in a congested CBD waterfront space between the Harbour to the west and another construction site to the east, and the complex sculptural design which required a lot of heavy lifting to build the structural elements for the low-rise entertainment floor and 75-storey high-rise, the project required a unique craneage solution.

“Having a long-standing working relationship with Crown’s construction partners, they got us in early to help come up with a solution. When they originally contacted us, their primary concern was borne out of a previous experience where the craneage solution wasn’t able to meet the demands of working at height in a high wind area like Barangaroo. The brief, in short, was to come up with a solution that would speed up the construction program without compromising on safety or quality,” said Marr’s Managing Director, Simon Marr.

Marr’s developed the bespoke super high-speed Marr’s 390D crane with a high capacity winch system for the high-rise construction. The super high-speed crane allowed lifts of up to 25 tonnes from ground level to the top of the tower in just over a minute, with the ability to work in the high winds prevalent at this elevation, which was one of the biggest challenges facing the construction team.

Lower down, the Marr 2480D heavy lift luffing crane, the world’s largest capacity tower crane with the ability to lift up to 330 tonnes in a single lift, made fast and light work of the heavy lift requirements, lifting large steel reinforcing beams weighing up to 100 tonnes in a congested CBD site. The crane lifted the 100-tonne beams and 50-tonne columns that formed the base of the structure in single lifts, allowing the project to reduce its build time, offer a safer method of construction and reduce complexity on site.

Crown Sydney also adopted a top-down construction methodology which allowed two work fronts, with the M2480D employed to lift heavy general machinery (such as excavators and drills rigs), saving the cost of crawler cranes and allowing excavation work to be taken off critical path. It also gave Lendlease and Crown Sydney options for how to deal with any unexpected lifting requirements during the excavation works.

Marr’s team also designed a three-beam internal climbing system to suit the jump-form construction methodology used on the project, which reduced the number of climbs and disruption to the project by approximately 30 per cent with a typical 20-metre climbing cycle completed within two hours.

An additional M390D and M440D were also on-site to assist with the construction of the entertainment floor and hotel. Both crane solutions were designed to fit in with Crown’s construction methodology.

 

Share30Tweet19Share5Pin7Send
cbnme

cbnme

Recommended For You

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

January 22, 2026
World Economic Forum: Shamma bint Mohammed Spotlights Emirati Women’s Shift from Empowerment to Global Leadership

World Economic Forum: Shamma bint Mohammed Spotlights Emirati Women’s Shift from Empowerment to Global Leadership

January 21, 2026
QIA, Goldman Sachs Sign MoU to Deepen Strategic Partnership, Targeting $25 Billion in Investments

QIA, Goldman Sachs Sign MoU to Deepen Strategic Partnership, Targeting $25 Billion in Investments

January 21, 2026
Gold and Silver Keep Reaching New Record Highs

Gold and Silver Keep Reaching New Record Highs

January 21, 2026
Automobili Lamborghini sets new record for deliveries in 2025 despite headwinds

Automobili Lamborghini sets new record for deliveries in 2025 despite headwinds

January 21, 2026
Over 250 global visionaries will surface unseen breakthroughs across the food chain from origin to market

Gulfood Launches Dedicated Platform to Support High-Growth Food-Tech Startups

January 21, 2026
Next Post

VIDEO: E-live roundup— The future of public restrooms post COVID-19

Latest News

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

January 22, 2026
The Sky Mansion is a masterpiece of design

ELEVATE Sets New Benchmark with AED 38 Million Sky Mansion Sale

January 21, 2026
Breez presents a rare ownership opportunity in one of the city’s most prestigious waterfront locations

Breez by Danube Leads Dubai’s Next Wave of Waterfront Living

January 21, 2026
Dubai Holding strengthens its presence in Europe’s hospitality sector by acquiring a property in Mallorca

Dubai Holding strengthens its presence in Europe’s hospitality sector by acquiring a property in Mallorca

January 21, 2026
BusinessToday_logo

Get In Touch

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Business Today Middle East – December 2025
BusinessToday Magazines

Business Today Middle East – December 2025

by Aya Zhang
January 13, 2026
BusinessToday-nov-2025
BusinessToday Magazines

Business Today Middle East – November 2025

by Staff Writer
January 13, 2026
Sister Publications
  • Construction Business News
  • Design Middle East
  • Logistics News ME
  • Hotel & Catering
  • Entrepreneur Al Arabiyah
  • Entrepreneur Middle East
Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW

Get In Touch

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Sister Publications
  • Construction Business News
  • Design Middle East
  • Logistics News ME
  • Hotel & Catering
  • Entrepreneur Al Arabiyah
  • Entrepreneur Middle East
Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW
Business Today Middle East – December 2025
BusinessToday Magazines

Business Today Middle East – December 2025

by Aya Zhang
January 13, 2026
BusinessToday-nov-2025
BusinessToday Magazines

Business Today Middle East – November 2025

by Staff Writer
January 13, 2026

Copyright © 2026 BNC Publishing. All Rights Reserved.

No Result
View All Result
  • Home
  • Landing Page
  • Buy JNews
  • Support Forum
  • Contact Us

© 2026 BusinessToday . All Rights Reserved.

Go to mobile version