• Contact
  • Magazines Archive
  • Subscribe Now
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
No Result
View All Result
Home Construction

Ashghal Commences Excavation Works on Mesaimeer Surface and Ground Water Drainage Project

Staff writer by Staff writer
May 22, 2014
in Construction
the Public Works Authority (Ashghal)
the Public Works Authority (Ashghal)

President of the Public Works Authority (Ashghal) Eng. Nasser bin Ali Al Mawlawi inaugurated the commencement of excavation works for Mesaimeer Surface and Ground Water Tunnelling, a significant project being undertaken by Ashghal to enhance Qatar’s drainage network.

This inauguration was conducted during a site visit by Ashghal’s President to the work launch site at Al Thummama area. He was accompanied by HE Italian Ambassador to Qatar Guido De Sanctis and senior officials from Ashghal including Director of Infrastructure Affairs Jalal Yousef Salhi and Director of Asset Affairs Hamad Mohamed Al Tamimi. Also present at the inauguration were representatives from Ashghal’s roads and drainage Operations and Maintenance department, CDM Smith the project consultant, Salini Impregilo Construction Company the project contractors, and Herrenkenecht, German manufacturing company for the Tunnel Boring Machines (TBM) being used to excavate the tunnels.

The Mesaimeer tunnel for surface and ground water is one of the key drainage projects within Ashghal’s plans for upgrading Qatar’s drainage network. The tunnel will run under the F-Ring Road and extends 9.7 km. It will stretch 5.4 km from Al Thumama to the west and 4.3 km to the east to the planned pumping station near the new Hamad International Airport.

Being undertaken by Ashghal to enhance Qatar’s drainage network, the Mesaimeer surface and ground water tunnel will alleviate Doha’s storm water by transporting it from a 170 km? of catchment area, covering southern and western parts of greater Doha. The tunnel will be linked to the existing and planned drainage network in the areas that it will traverse.

To allow access for inspections and regular maintenance of the tunnel, an operations and maintenance plan has been developed to ensure satisfactory operation of all elements. This will be facilitated through 21 access shafts linking ground level to the 20 – 30m depth of the tunnel.
The specially manufactured TBMs operating through pressure balanced excavation technology are ideal for Doha ground conditions at a depth of 30 metres. This technology will facilitate the construction of essential infrastructure tunnelling which is paramount to accomplish a sophisticated tunnel network.

Over the past 16 months, Ashghal has been involved in rigorous planning and preparation process for the tunnelling project. The works included design, fabrication and installation of TBMs, geotechnical investigations and site mobilisation. Excavation works were conducted to prepare the launching tunnel and additional elements to support the TBMs such as portal cranes and other enabling requirements were installed.

The Mesaimeer tunnel project is scheduled to be completed by early 2017. Ashghal also reported that design and tender documents preparation for phase 2 of the project are being finalised. This second phase includes a pumping station with a capacity of 19 cubic metres per second, which will ultimately discharge the collected storm water from the Mesaimeer tunnel through an offshore outfall several kilometres away from the shoreline, thus ensuring protection of the shoreline and surrounding environment.

Source : Qatar News Agency

Tags: Mesaimeer Surface and Ground Water Drainage ProjectThe Public Works Authority ‘Ashghal’
Share30Tweet19Share5Pin7Send
Staff writer

Staff writer

Recommended For You

Emirates Partners with World No. 1 Tennis Player Aryna Sabalenka

January 21, 2026

Hyperloop – traveling through a vacuum at 1,000kilometers per hour

January 21, 2026

Ardee Launches AED 2 Billion Fairmont Waterfront Project in Ras Al Khaimah

January 12, 2026

Supply Chain Disruption Moves From Shock to Status Quo, Says DP World

January 12, 2026
Dubai Property Market Sees AED431 Billion in Deals in First Half of 2025

Dubai closes 2025 with its strongest ever property sales quarter at AED 187bn

January 12, 2026

Aldar successfully prices US$1.0 billion hybrid notes to accelerate growth agenda

January 10, 2026
Next Post
Qatar Stock Exchange Down 0.11%

Qatar Stock Exchange Down 0.43%

Latest News

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

OpenAI Unveils GPT-5.2: From “Chatbot” to the First Universal AI Work Engine

January 22, 2026
The Sky Mansion is a masterpiece of design

ELEVATE Sets New Benchmark with AED 38 Million Sky Mansion Sale

January 21, 2026
Breez presents a rare ownership opportunity in one of the city’s most prestigious waterfront locations

Breez by Danube Leads Dubai’s Next Wave of Waterfront Living

January 21, 2026
Dubai Holding strengthens its presence in Europe’s hospitality sector by acquiring a property in Mallorca

Dubai Holding strengthens its presence in Europe’s hospitality sector by acquiring a property in Mallorca

January 21, 2026
BusinessToday_logo

Get In Touch

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Business Today Middle East – December 2025
BusinessToday Magazines

Business Today Middle East – December 2025

by Aya Zhang
January 13, 2026
BusinessToday-nov-2025
BusinessToday Magazines

Business Today Middle East – November 2025

by Staff Writer
January 13, 2026
Sister Publications
  • Construction Business News
  • Design Middle East
  • Logistics News ME
  • Hotel & Catering
  • Entrepreneur Al Arabiyah
  • Entrepreneur Middle East
Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW

Get In Touch

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Sister Publications
  • Construction Business News
  • Design Middle East
  • Logistics News ME
  • Hotel & Catering
  • Entrepreneur Al Arabiyah
  • Entrepreneur Middle East
Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW
Business Today Middle East – December 2025
BusinessToday Magazines

Business Today Middle East – December 2025

by Aya Zhang
January 13, 2026
BusinessToday-nov-2025
BusinessToday Magazines

Business Today Middle East – November 2025

by Staff Writer
January 13, 2026

Copyright © 2026 BNC Publishing. All Rights Reserved.

No Result
View All Result
  • Home
  • Landing Page
  • Buy JNews
  • Support Forum
  • Contact Us

© 2026 BusinessToday . All Rights Reserved.

Go to mobile version