• Contact
  • Magazines Archive
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
  • News
  • Business
    • Markets
      • Money
      • Tech News
      • Healthcare
      • Opinion
    • Appointments
  • Real Estate
  • Technology
  • Energy
  • Hospitality
    • Hotel
    • Catering
  • Lifestyle
    • Fashion
    • Sports
    • Cars
    • Travel
  • Design
  • Interviews
  • Regional Roundup
No Result
View All Result
Business Today Middle East
No Result
View All Result
Home Construction Machinery

Marr Contracting Pty Ltd have completed a world-record lift during construction of the 1915 Çanakkale Bridge in Turkey

cbnme by cbnme
June 28, 2020
in Machinery, News
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Australian-based heavy lifting tower crane specialists, Marr Contracting Pty Ltd (The Men From Marr’s), have completed a world-record lift during construction of the 1915 Çanakkale Bridge in Turkey.

The record-breaking construction feat saw one of Marr’s M2480D Heavy Lift Luffers (HLL) – which with a lifting capacity of 330 tonnes is the world’s largest capacity tower crane – undertake the world’s heaviest (155 tonnes) at height (318 metres) craneage lift on what will be the world’s longest span suspension bridge.

With the M2480D crane perched 328 metres above the water, it took approximately 30 minutes to lift a 155-tonne piece of the upper cross beam (UCB) to its position 318 metres above sea level. The installation of the centre section of the UCB on the Asian side of the Çanakkale Strait, completed a major milestone in the construction of the bridge, with the lift taking place at midnight on Sunday 7 June 2020. The European side was completed 24 hours later, with the final centrepieces installed on both sides of the Bridge at a final height of 318 metres on Monday 8 June 2020.

The engineering solution that made the world-record lift possible was one of the reasons DLSY (Daelim – Limak – SK E&C – Yapi Merkezi) Joint Venture awarded the craneage contract to Marr Contracting International in 2017 after a competitive tender process including some of the world’s leading craneage companies.

Impressed by Marr’s track record in designing and delivering innovative lifting solutions on similarly challenging large-scale projects in Australia and around the world, DLSY Joint Venture challenged the Marr team to develop a strategy that would decrease construction time and associated risk.

The Marr team worked with the DLSY project team to develop a craneage methodology that makes use of the M2480D HLL crane’s capacity to lift heavier modularised components instead of the more traditional approach of lifting smaller components one-by-one and then welding on-site.

Two of Marr’s M2480D cranes have been on-site since last year constructing the bridge’s 318-metre high towers, and through fewer lifts of larger pieces the craneage solution has reduced the construction schedule, with less site-based activities and a higher level of on-site safety.

According to the Deputy Project Manager, Alper Alemdaroglu, the DLSY Joint Venture wanted a heavy lifting partner who could think outside-the-box to make their vision for how they wanted to build the Bridge a reality.

“The Men From Marr’s have a reputation for technical competence and innovative thinking in developing strategies for heavy lifting on projects of this scale, but what has impressed us most is their collaborative approach to finding a solution that suited our construction methodology and programme, and then delivering it,” said Mr Alemdaroglu.

Highlighting that a strong working relationship and alignment between Marr and the Joint Venture partners has been key to the project’s success to date, Marr Contracting Managing Director, Simon Marr, said, “DLSY knew what they wanted, and they were also open to a non-traditional heavy lifting solution. As experts in construction, the Joint Venture partners respected our expertise in heavy lifting and together we have been able to construct the tower stage of the project in record time”.

“The unparalleled lifting capacity of our M2480D HLL cranes have been a game changer for this project and will potentially change the way our industry looks at how bridges can be built, as well as a host of other large scale projects. We are using the same way of thinking to challenge methodology on the construction of other projects including metro train stations, data centres, large commercial construction, energy construction and working refineries,” Mr Marr said.

The record-breaking lift is one of a number of engineering feats completed by The Men From Marr’s on the construction of this nation-building project. In November 2019, after being fully assembled at a dry dock, two of Marr’s M2480D HLL cranes were lifted as complete units, each weighing 600 tonnes, by a floating crane and transported a kilometre to the bridge tower caisson in the middle of the Dardanelles (Çanakkale Strait), where they were successfully installed in a one day operation.

CEO of the joint-stock company established by the Turkish-Korean consortium, ÇOK A.Ş., Mr Mustafa Tanriverdi, said, “The four joint venture partner companies (Limak and Yapı Merkezi from Turkey, Daelim and SK E&C from South Korea) are contributing to the project by allocating their particular technical expertise acquired from working on diverse projects across the world to all phases of the project. With such strong historical links between Turkey and Australia, we are delighted to have an Australian team contributing their expertise and innovative thinking to this important nation-building project.”

Share30Tweet19
cbnme

cbnme

Recommended For You

Through the programme, students explored key principles of sustainable material selection, carbon-conscious design, and effective waste management

Nakheel and Bildits Launch ‘Blueprint for the Future’

January 8, 2026
The campaign is launched under the slogan ‘Step by Step’ and focuses on delivering clear, simplified awareness content that addresses the most common inquiries about Ejari services

DLD Promotes Lease Registration Compliance with New Ejari Awareness Campaign

January 8, 2026
The third runway represents a milestone within the King Salman International Airport Master Plan

KSIA Advances Airfield Expansion with Third Runway Milestone

January 8, 2026
Dubai Customs Deepens Partnerships with DHL

Dubai Customs Deepens Partnerships with DHL

January 6, 2026
Next Post

Sharjah tops 'High Growth' list in 2020 Global Startup Ecosystem Report

Related News

QFMA Makes Efforts to Develop Legislations Regulating Qatari Capital Market

QFMA Makes Efforts to Develop Legislations Regulating Qatari Capital Market

May 11, 2014
KPC signs USD2bln-worth oil supply deal with Petron Singapore

KPC signs USD2bln-worth oil supply deal with Petron Singapore

August 28, 2014
Etihad Airways to partner with Accenture

June 2020 Cover Story: Saud Abu Al-Shawareb, Managing Director of Dubai Industrial City

November 13, 2020
BusinessToday

Building #10, Dubai Media City
PO Box 502511, Dubai, United Arab Emirates

+971 4 420 0506

sales@bncpublishing.net
Jo@bncpublishing.net

Quick Links

  • Contact
  • Magazines Archive

Newsletter

Never miss any important news.
Subscribe to our newsletter.

SUBSCRIBE NOW

© 2026 BusinessToday . All Rights Reserved.

No Result
View All Result
  • Home
  • Landing Page
  • Buy JNews
  • Support Forum
  • Contact Us

© 2026 BusinessToday . All Rights Reserved.

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?